We Install What We Build

A sign is only as good as the way it’s mounted. That sounds obvious, but it’s the step where a lot of signs go wrong, and it’s the reason we hang the signs we fabricate instead of handing them off.
When we design your sign – we engineer in how we will install. When the same shop builds your sign and installs it, there’s no gap for problems to fall into. Nobody to point fingers if a bracket doesn’t line up or a mount is wrong for the wall. We designed it, we know how it goes up, and we’re the ones responsible for it looking right on your building.
If the business wants to handle installation themselves that is fine. We can provide an installation template to assist in lining up the sign.
Sign Installation is just part of our metal sign guide.
See additional components that are involved in a sign build.
Why the mounting surface matters
Different walls call for completely different hardware. Anchoring into brick is not the same as anchoring into block, into EIFS (the foam-and-stucco exterior on a lot of newer buildings), or into wood. Use the wrong anchor for the surface and one of two things happens over time: the sign works itself loose, or it damages the building.
This is a big part of why we want to know where your sign is going early. The wall it mounts to shapes the hardware, the labor, and the design itself. Getting it right in design means it goes up cleanly on install day.

What to expect on install day
We need access to where we are installing your sign. Usually, we do not need someone to sit through the process – just be available in case a question comes up.
How long does it take to install a sign?
Installation can take less than an hour to a few days. Sign installation time is mainly dependent on the construction type of the sign. It can be quick, if we have easy access to the area and the sign has been designed with a one piece construction so it essentially just needs to be hung on the wall.
If we are installing individual letters directly into the wall surface, it takes a lot of time. Each letter or component typically has three studs attached which require holes drilled and the letters/component installed one at a time.
Additionally, time is increased if we are dealing with weather, or a hard to reach area.
If your sign has lighting, that needs to be tied into your electrical – but that usually already to go when we get there.
We handle the mounting from start to finish: tools, equipment, mounting templates, positioning, anchoring to the wall, and making sure it sits level and secure.
Illuminated signs
A lit sign has one extra step: the electrical connection. The sign itself is built and mounted the same way, but power has to be brought to it and connected safely, which is site electrician’s work.
We plan the lighting and the power path as part of the design, so there are no surprises when it’s time to connect.

Part of the whole job, not a hand-off
Installation isn’t a separate company we call at the end. It’s the last step of the same process that started with your first phone call: design, fabrication, powder coating, and install, all under one roof. That’s how we keep the quality consistent from the drawing to the wall.
A note on home and cabin signs
Usually home and cabin signs are an easy installation handled by the owners. If you need assistance for a more complicated sign, we install personal and property signs too, on the same principle: the mount has to suit the surface, whether that’s a cabin’s log wall, a post, or a stone entrance.
Ready to get your sign on the wall?
Tell us where it’s going and what it’s mounting to, and we’ll take it from design all the way through installation.




NOTE:
We Do Not Install Signs We Have Not Fully Designed And Built.
Because we fully design signs from initial design to fabrication and installation – we do not take responsibility for signs we have not created.
